Oklahoma IBC Totes
Inspection protocols
Detailed inspection steps for cages, valves, and pallets before reuse.
Valve checks
Leak testing, handle replacement, and gasket inspection.
Cage integrity
Weld checks, bent rail detection, and structural assessment.
Pallet review
Inspect stringers, feet, and load bearing surfaces.
Inspection cadence
UN-rated totes require periodic inspections based on usage.
90-day inspection cycle for regulated totesPre-shipment check for all reconditioned unitsCondition tagging on intake